All Things Mk5 > Members Rides

Dazza's Maintenance Thread

<< < (22/63) > >>

dazza:
Still working on the sub box.  :confused:

More trimming down. The angle grinder and a 60 grit disk made short work of the Fiberglass.

The back of the box was a bit of a mess a few air spaces next to the bulk mat. Filled this with some filler.



dazza:
Cant believe it. Well happy with my self.

Sub box is finished 20L capacity.





gixerben:
Great workmate, looks very pro. the cloth looks a good match where did you pick that up?

dazza:
Thanks mate. Here is the cloth 5 meters is way to much they sell the same in a smaller length.

 http://www.amazon.co.uk/gp/r.html?C=3AOWPWPM94BIV&K=AJG7J56GJT7UP&R=CK0WR1DD40Z1&T=C&U=http%3A%2F%2Fwww.amazon.co.uk%2Fdp%2FB004TA7QJU%2Fref%3Dpe_385721_37038051_TE_3p_dp_1&A=DBELAKJ56ZMZTLG0MXNLCUEXYP0A&H=REBPLDDAV2L5NWZPJXSS3BA0RDUA

gixerben:
I could use the left overs to recover the lounge carpet :grin: thanks for the link, may come in handy if and when i start my build.

Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version